Building Conditions Surveys
Performed precondition surveys of all 110 buildings and a visual survey with photo-documented deficiencies
The New York City Metropolitan Transit Authority required survey, evaluation, and design services for 110 buildings located along and adjacent to Second Avenue between 63rd and 86th Streets. The purpose of this assignment was to document the condition of the existing buildings and to design repair details for the structures (as necessary) in conjunction with the construction of the Second Avenue Subway.
Geocomp was selected by the prime consultant as a subconsultant for this project assignment. The project team reached out to each building owner to communicate project goals and developed an inspection schedule based upon the owner’s input. The team performed precondition surveys of all 110 buildings.
During the inspection, we conducted a visual survey and photo-documented any deficiencies found on the structures. We evaluated the condition of the façade, exposed foundations, and appurtenances which overhang on walking streets of pedestrians. We also determined the vertical profile for low-rise masonry buildings using optical survey instruments. Upon completion of the inspection, our team submitted precondition survey reports documenting the current condition of each building.