The Challenge

  • Instrument the Central Artery Tunnel
  • Monitor during construction

Canopy by Hilton Hotel on 111 North Street in Boston, MA was a $125 million project joint venture between CV Properties, Harbinger Development and Olshan Properties.

In addition to the hotel, the project also includes 12,711 square feet of retail and restaurant space. Portions of the building are built above a very sensitive structure: the Central Artery Tunnel that carries I-93 beneath downtown Boston.

The Solution

Geocomp provided real-time monitoring during construction of the hotel above the tunnel. The final design for the hotel called for a portion of the structure’s weight to be carried by the existing tunnel roof girders.

During excavation of the soil above the tunnel and subsequent backfill and vertical construction, the tunnel roof girders were expected to deflect upwards as the soil load was removed, and then settle as the foundation elements and structural load related to the building were added. Geocomp actively monitored the ceiling and walls of the tunnel to ensure that the actual measured deflections did not exceed the specified design criteria. An automated motorized total station (AMTS) was installed prior to construction to monitor the tunnel walls.

In addition, Geocomp designed a customized liquid-level monitoring system specific to the project. The liquid level system was installed to measure the deflections inside certain confined spaces in the ceiling of the tunnel where the AMTS was unable to monitor.

Services Provided

Data Management

Real-time automated data monitoring with iSiteCentral®

Custom Design of Liquid Levels

Designed a customized liquid-level monitoring system

Instrumentation & Monitoring

Instrumentation and monitoring during construction

Related Projects

GEOPROJECT_Central Artery Tunnel

Central Artery/Tunnel

Value Delivered:

Helped avoid major cracking of adjacent structures
Under budget, extended monitoring by 25 years
Kept construction movements within tight tolerances
Detected movements and issued project alerts
GEOPROJECT_East Side Access

East Side Access

Value Delivered:

24/7 monitoring and reporting provided essential data
during critical and sensitive phases of construction
Decreased travel time for commuters across the city
GEOPROJECT_East Side Access Tunnel Excavation

East Side Access Tunnel

Value Delivered:

Automated instrumentation provided alerts to
unacceptable movement during construction
Instruments installed designed to be read remotely
and notification automatic
Dramatically shortened travel time for commuters

Ready to Speak
with our
Experts?