Active Risk Management®
Consulting

Effectively identify and mitigate risks to ensure the success of your projects.

Key Benefits of
Active Risk Management®

Empower projects with informed decision-making and proactive risk management.

  • Bullet symbol
    Identify, Assess, Mitigate Gain a quantitative understanding of risks and their potential impact on cost, schedule, and quality.
  • Bullet symbol
    Data-Informed Decisions Leverage real-time data for informed decision-making using iSiteCentral® data management software.
  • Bullet symbol
    Evaluate & Manage Threats Receive expert recommendations for proactive risk response strategies throughout the project lifecycle.

Monitor and Mitigate
Risks Effectively

Develop quantified assessments of potential risk events, their likelihoods, and consequences.

Our Specialized
Consulting Expertise

Discover additional services

TVA Facility Birdseye View

Geostructural Consulting

We provide a unique suite of geostructural consulting services that assist property owners and project design teams to produce innovative and efficient structures, reduce project costs, save time, and minimize potential risks.

S-scan at TVA

Asset Management

We provide a systematic business process and decision-making framework to help clients make cost-effective investment decisions. Our method combines our proven capabilities in performance monitoring, engineering, risk analyses, and cloud-based data management.

Champlain Towers

Geotechnical Engineering

We couple our in-depth geotechnical knowledge of soil, rock, and water interaction with our understanding of structural performance to provide a comprehensive analysis of underground conditions and potential hazards.

Geostructural Excellence
in Every Project

Discover the Success of Our Projects in Action
GEOPROJECT_Corridor H

Corridor H Bridge

Value Delivered:

Determined the cause of the pier movement
Monitoring showed ongoing movement driven by
groundwater
Geocomp’s stabilization method proved cost-effective
GEOPROJECT_Fukushima

Fukushima Nuclear Power Plant

Value Delivered:

Developed risk register, identifying risks and their
potential causes, impacts, and mitigation measures
Performed modeling to evaluate design feasibility
and risks
GEOPROJECT_Oosterschelde

Oosterschelde

Value Delivered:

Evaluated flood barrier design, predicted displacement
Innovative solutions addressed liquefaction and piping
concerns
Pioneered extensive geosynthetic use for foundation
protection
GEOPROJECT_Second Ave Buildings

Second Avenue Buildings

Value Delivered:

Established integrity of buildings by identifying limiting
and threshold values for various construction activities
Ensure baseline conditions to gauge the effects of
construction on adjacent properties