Noise Monitoring
Provided noise control and monitoring as part of the reconstruction work for a 5 year contract
The New York City Department of Design and Construction (DDC) has been working to restore and repair New York City’s aging water distribution system. In doing so, the DDC constructed a new water tunnel, City Tunnel No. 3. The W. 60th Street project is one of eleven such planned projects in Manhattan that connect new shaft distribution chambers to Tunnel No. 3.
Geocomp had a 5-year contract to provide noise control and monitoring as part of the reconstruction work that the DDC conducted to rehabilitate New York City’s water distribution system. Serving as the noise control specialist for Waterworks JV, Geocomp developed a site-specific noise control and monitoring plan that integrated our web-based iSiteCentral® database for real-time monitoring with our expertise in noise monitoring. Geocomp designed and installed an automated monitoring system that monitored indoor and outdoor noise at four construction sites.