The Challenge

  • Construction in close proximity to residential and historic structures
  • Reduce the risk of structural damage and ensure stability of adjacent buildings during construction
  • Shallow groundwater and highly permeable soils

A developer in Atlanta, GA required a dewatering and excavation support system designed to minimize predicted ground settlement, thereby reducing the risk of structural damage and ensuring the stability of adjacent buildings. Given the presence of shallow groundwater and highly permeable Piedmont residual soils, the risk of inducing settlement during excavation was significant.

The Solution

A typical dewatering system would have significantly lowered groundwater levels near the adjacent buildings, resulting in soil consolidation and large differential settlements. Geocomp opted for an unconventional approach:

  • Installing dewatering wells within the excavation footprint while placing recharge wells outside the excavation to maintain groundwater balance around critical structures.
  • A 36-inch soil-mix wall reinforced with steel H-piles for excavation support
  • Geometry and tieback configuration based on the proximity of sensitive structures, the most robust configuration nearest to the adjacent home and historic building
  • Real-time monitoring using automated prisms and piezometers to track soil and structure movements and pore pressure below and around the outside perimeter of the excavation

Services Provided

Custom Dewatering System

Built a customized dewatering and excavation support system

Real-Time Monitoring

Provided real-time monitoring of soil, structure movements, and pore pressure

Deep Excavation

Enabled deep excavation in a sensitive urban setting while minimizing risk to adjacent structures

Data-Driven Approach

Delivered a site-specific, data-driven approach that redefines best practices

Related Projects

S-scan in building

Indoor Building Investigation

Value Delivered:

Provided imaging beyond capabilities of GPR, enabling
insights where drilling was restricted
Team collected results within two days with minimal impact
on building operations
The analysis guided a mitigation plan to prevent future cracking
GEOPROJECT_Second Ave Buildings

Second Avenue Buildings

Value Delivered:

Established integrity of buildings by identifying limiting
and threshold values for various construction activities
Ensure baseline conditions to gauge the effects of
construction on adjacent properties
Eillis Square Parking Garage

Ellis Square Parking Garage

Value Delivered:

Real-time performance monitoring provided essential data
for assessing deformation during construction