The Challenge

  • Vibration and damage complaints
  • Vibration monitoring of 150 historic structures

The “Big Dig” project in Boston, MA was a massive road infrastructure project that began in the early 90s to improve the flow of traffic and alleviate commuter congestion. Early in the project, occupants of the historic buildings began complaining about large vibrations and damage to their buildings.

The Solution

Geocomp provided the Massachusetts Turnpike Authority (now MassDOT) with structural and vibration monitoring services for the Central Artery/Tunnel project that spanned over a 9 year period. The instrumentation system was designed by each independent section designer, one component of which included vibration monitoring of 150 historic structures.

The real-time data provided the contractor timely feedback on the impact of their work on the adjacent structures, which allowed the contractors to adjust their methods as necessary and reduce potential for damaging adjacent sensitive structures.

The readings were verified by Geocomp’s project team and then transmitted electronically to the Program Manager’s GIS database. Data was then further distributed to abutters, contractors, managers and owners.

Services Provided

Real-Time Data & Reporting

Provided timely feedback on the impact of work on the adjacent structures

Vibration Monitoring

Instrumentation and vibration monitoring of 150 historic structures

Related Projects

GEOPROJECT_Canopy Hotel

Canopy Hotel Boston (Parcel 9)

Value Delivered:

Monitor tunnel ceiling for public safety during
construction
Provide 24/7 automated monitoring and alerts for
informed decision making
Customize liquid-level monitoring for project needs
GEOPROJECT_Edmonton Light Rail

Edmonton Light Rail Tunnel

Value Delivered:

Automated geotechnical instrumentation and monitoring
of tunnel saving the client money
Reduce risk to general public and nearby property owners
by providing real-time automated alerts
GEOPROJECT_Middlebury Monitoring

Middlebury Monitoring Phase 1-3

Value Delivered:

Automated alerts to essential personnel if instruments
reached predetermined limit level compromising adjacent
historical structures
Remote adjusting trigger levels reduced need for trips to
project site, saving client time and money