Vibration Monitoring
Collection of vibration data utilizing Geocomp’s S-lynks wireless accelerometer notes
The Leonard P. Zakim Bunker Hill Bridge is a critical transportation link in Boston, carrying eight lanes of I-93 traffic and a connecting ramp. Given its scale, importance, and as part of bridge routine preservation efforts, ongoing monitoring of its stay cables and structural dynamics is essential for long term performance, safety, and early detection of changes in condition.
To support development of an upcoming bridge preservation project, Geocomp provided: