Bridge Monitoring Plan
Developed a monitoring plan to monitor the new bearing and bridge girders
With the bearing connection failure causing major distress to the bridge deck, the bridge needed to be immediately closed to all traffic, impacting the public for commuting and commerce for the major interstate highway. The client was in immediate need of experts to devise a quick monitoring program so the bridge could be back up and running as soon as possible.
Kentucky DOT referred the bridge contractor to Geocomp to develop and install a monitoring system. Geocomp was able to utilize our technologies and expertise to quickly develop a monitoring plan consisting of string potentiometers and tiltmeters to monitor the bearing and the bridge girders. The plan was approved by both DOTs and Geocomp agreed to be “on-call” to install the monitoring system as soon as the repairs were completed.