The Challenge

  • Underground tunnel and station excavation
  • Urban construction challenges
  • Protection of existing structures

The TransEd Valley Line LRT is building a light-rail transit (LRT) project in Edmonton, Alberta, connecting Mill Woods to downtown Edmonton with approximately 13 km of light-rail. This stage includes 11 stops, an elevated station. It also consists of two, one-mile-long tunnels under the center of Edmonton.

The underground work to be done includes bored tunnels and station excavations. Since the work takes place in an urban setting, the protection of existing structures and buried utilities that could be impacted by the construction is critical to the successful completion of the work.

The Solution

Geocomp provided instrumentation and monitoring for one mile of twin bored tunnels, using our iSiteCentral® GIS web-based software to provide real time assessment of construction related activity. iSiteCentral® integrated data from more than 2,000 sensors, including automated MPBXs, inclinometers, vibrating wire piezometers, and tilt meters, with settlement measurements and performance data from the contractor’s own tunnel monitoring regime.

The software also incorporates installation documentation and photos into the database to better centralize all instrumentation information and make it readily accessible for reporting and review by TransEd. Geocomp installed a combination of manual survey and automated instrumentation monitoring to best suit the project requirements. The automated instruments were entirely wireless and solar or battery powered. A combination of radios and cellular modems were used to transmit data to the servers and web-based data management center, allowing near real-time viewing of data by anyone with an internet connection and the correct login credentials.

Services Provided

Instrumentation & Monitoring

Provided instrumentation and monitoring for one mile of twin bored tunnels

Data Management

 iSiteCentral® GIS web-based software to provide real time assessment of construction activity

Automated Instruments

The automated instruments were entirely wireless and solar or battery powered

Real-Time Monitoring

Radios and cellular modems were used to transmit data to the servers and web-based data management center

Related Projects

Middlebury Monitoring

Middlebury Monitoring Phase 1-3

Value Delivered:

Automated alerts to essential personnel if instruments
reached predetermined limit level compromising adjacent
historical structures
Remote adjusting trigger levels reduced need for trips to
project site, saving client time and money
Edmonton Light Rail

Edmonton Light Rail Tunnel

Value Delivered:

Automated geotechnical instrumentation and monitoring
of tunnel saving the client money
Reduce risk to general public and nearby property owners
by providing real-time automated alerts
Canopy Hotel

Canopy Hotel Boston (Parcel 9)

Value Delivered:

Monitor tunnel ceiling for public safety during
construction
Provide 24/7 automated monitoring and alerts for
informed decision making
Customize liquid-level monitoring for project needs