The Challenge

  • Project involves constructing 1.9-mile underground light-rail system with three new stations
  • Creating direct connections between Azusa, Long Beach, East LA, and Santa Monica

LA Metro awarded the $1.4 billion contract to the Regional Corridor Constructors (RCC Team – led by the Skanska/Traylor JV) to build the L.A. Regional Connector Transit Corridor, a 1.9-mile underground light-rail system connecting the Metro Gold Line to the 7th Street/ Metro Center Station. It included three new stations, all cut-and-cover braced excavations. It creates a direct connection between Azusa and Long Beach and between East Los Angeles and Santa Monica.

The Solution

Geocomp’s contract included instrumentation and monitoring for over one mile of twin bored tunnel and three cut-and-cover/station excavations using our iSiteCentral® GIS web-based software to provide continuous, real-time assessment of construction-related activity to help the contractor control excavation/tunneling work and to mitigate risk of unexpected movement to adjacent buildings and utilities.

Geocomp’s iSiteCentral® integrated data from more than 3,000 sensors, including automated MPBXs, inclinometers, strain gages, load cells, tilt meters, settlement monitoring points, and performance data from the contractor’s TBM. Remotely positioned data collection systems were placed along the full length of the 1.9 mile transit line. Data was then transmitted wirelessly to the database.

Services Provided

Tunnel Excavation Monitoring

Instrumentation and monitoring of tunnel excavation integrating more than 3,000 sensors of data points

Real-Time Data Management

iSiteCentral® web-based software provided continuous, real-time assessment of construction-related activity

Related Projects

GEOPROJECT_Second Ave Subway

Second Avenue Subway

Value Delivered:

Instrumentation and monitoring during demolition
provided project alerts safeguarding buildings and utilities
surrounding the site
GEOPROJECT_Central Artery Tunnel

Central Artery/Tunnel

Value Delivered:

Helped avoid major cracking of adjacent structures
Under budget, extended monitoring by 25 years
Kept construction movements within tight tolerances
Detected movements and issued project alerts
GEOPROJECT_World Trade Center

World Trade Center

Value Delivered:

Real-time monitoring enabled continuous tunnel and
wall deformation detection during construction

Ready to Speak
with our
Experts