The Challenge

  • Levee protection failure
  • Flood devastation consequences
  • Engineering negligence allegations

Hurricane Katrina struck New Orleans during the morning of August 29, 2005. It caused numerous failures of the levee protection system and flooding of New Orleans. Two breaches of the East Bank Industrial Area (EBIA) levees resulted in the inundation and destruction of the Lower Ninth Ward and parts of Chalmette. Claims filed in US District Court contended that the US Army Corps of Engineers were negligent in maintaining and protecting the integrity of the levee and floodwall system along the EBIA.

Plaintiffs asserted that environmental remediation work performed on the flood side of the levee system provided preferential pathways for water pressure to transmit beneath the floodwall and cause the landside embankment to fail by shear sliding.

The Solution

The USACE was defended by the US Department of Justice who retained Dr. W. Allen Marr, founder and CEO of Geocomp, as one of its expert witnesses. Geocomp personnel were involved in the oversight of continuous undisturbed sampling with 5-inch diameter tubes, cone penetration testing, field vane testing and in- situ permeability testing.

Geocomp also provided laboratory testing services including direct simple shear strength testing, constant rate of strain consolidation testing and permeability testing to help characterize the strength, compressibility and permeability of the natural soils in the levee’s foundation.

Our team of engineers assisted Dr. Marr in his evaluation with extensive analyses of global stability groundwater flow and deformations caused by the hydraulic loading of the floodwall. These analyses included 3D finite element analyses to examine the stresses developed in the structural elements of the wall due to differential deformations of the soil foundation and transient seepage analyses to evaluate the time required for pore pressures to increase in the levee embankment.

Services Provided

3D Modeling & Failure Analysis

3D finite element analyses to examine the stresses developed in the structural elements of the wall

Laboratory Testing

Direct simple shear strength, constant rate of strain consolidation, and permeability testing

Witness Testimony

Evaluation with extensive analyses of global stability groundwater flow and deformations of the floodwall

Related Projects

GEOPROJECT_Bayou Lafourche Bridge

Bayou Lafourche Bridge

Value Delivered:

Provided ongoing monitoring for the client to understand
structural performance
Performed a load test of the bridge structure prior to bridge
opening to test for safety
GEOPROJECT_Kentucky Lock Addition

Kentucky Lock Addition

Value Delivered:

Provide real-time monitoring that satisfies the USACE
requirements for assuring stability and operation of existing
lock through construction
Provide real-time monitoring for contractors to assure
life-safety issues are mitigated during open excavation
GEOPROJECT_I-93 South Station

I-93 South Station

Value Delivered:

Analyses and risk assessment showed a better performing
project with less risk than original contract method
Saved the owner $60,000,000 in claims