The Challenge

  • Aging structure
  • Full deck replacement
  • Threshold exceedance for fatigue life

The Interstate 91 Viaduct, constructed in the late 1960’s, is an elevated bridge running through Springfield, Massachusetts. The elevated structure consists of multiple simply supported spans with a length of approximately one mile and was in need of replacement. Based on the feasibility study performed by CME Associates, the Massachusetts Department of Transportation (DOT) opted to rebuild the viaduct by performing a full deck replacement and evaluate the existing structure through instrumentation and monitoring to provide a minimum 20 year service life.

CME then performed an initial fatigue analysis that showed a number of critical locations exceeded AASHTO threshold values for infinite fatigue life. Before recommending costly strengthening and retrofit repairs, CME recommended implementing a Structural Monitoring program to determine constant effective stress range (CESR).

The Solution

Geocomp’s installed 150 spot weldable strain gages on superstructure steel members and collected data continuously for a two week period using a remote access high-speed data logging system. In order to process the data, Geocomp developed an automated program to perform the stress loading cycle counting for the fatigue analysis in accordance with ASTM E1049-85 – standard practices for cycle counting in fatigue analysis. The data collected allowed for a differentiation between traffic stress loading and thermal induced stresses, which often can be significantly greater than live load stresses.

As a result of the successful performance of the instrumentation and monitoring program, CME was able to show all of the locations gaged resulted in a CESR that was less than the specified infinite fatigue life thresholds listed in the AASHTO LRFD Bridge Design Specifications. Predictions based on the stress loading data resulted in an estimated 35-year life extension of the superstructure and removed the immediate need for structure strengthening, saving the owner more than $600,000,000 in repairs.

Services Provided

Bridge Fatigue Assessment

Structural model validation to assess fatigue life of critical bridge components

Stress Monitoring & Fatigue Analysis

Developed an automated program to perform the stress loading cycle counting for the fatigue analysis

Structural Life Extension

Predictions based on the stress loading data resulted in an estimated 35 year life extension

Related Projects

GEOPROJECT_Carbon Fiber Reinforced Polymer

Carbon Fiber Reinforced Polymers

Value Delivered:

New materials help combat steel reinforcement corrosion,
providing long term durability
Embedded sensor technology measures the effects of
movement in the bridge, utilizing innovative materials
Long-term data can be used to compare performance
with steel reinforced structures
GEOPROJECT_MBTA Gloucester Commuter Rail

MBTA Gloucester Commuter Rail

Value Delivered:

Automated alerts to stop trains if excessive movement
is detected
Automation resulted in 80% cost savings to the client
GEOPROJECT_Accelerated Bridge Program

Accelerated Bridge Program

Value Delivered:

Minimize the probability and consequences of
adverse events
Maximize the probability and consequences of
positive events

Ready to Speak
with our
Experts?