Performance Monitoring
Design and installation of sensors to monitor long term behavior of bridge
The M-50 Bridge Project in Jackson, MI involved fabrication and installation of 20 load cells for monitoring transverse Carbon Fiber Reinforced Polymer (CFRP) tendons and a data collection method to measure long term post-tensioning forces.
Geocomp designed and fabricated 20 custom built 300-kip electrical resistance load cells, and calibrated and installed the load cells on the 40-mm diameter transverse Carbon Fiber Composite Cable (CFCC) with a switch panel for collection of manual load cell readings by MIDOT personnel.
For the M-39 Bridge, Geocomp designed and installed sensors, a data logger, and data management system inside an environmentally controlled enclosure to collect long-term real-time data posted to Geocomp’s iSiteCentral® data management system for review and reporting.