Instrumentation Deployment
Furnish, install, maintain and monitor the required structural and geotechnical instrumentation
The East Side Access (ESA) project in NYC connects the Long Island Railroad’s Main and Port Washington lines in Queens to a new LIRR terminal beneath Grand Central Station in Manhattan. The new connection will increase the LIRR’s capacity into Manhattan, relieve the overcrowded Penn Station, and dramatically shorten travel time for Long Island and eastern Queens commuters traveling to the East Side of Manhattan.
Tutor Perini selected Geocomp to furnish, install, maintain, and monitor the required structural and geotechnical instrumentation for this project. Construction components included retaining walls, bridges, a substation, and a vehicular access bridge along with all the associated foundations and utilities. The monitoring system implemented by Geocomp included Automated Motorized Total Stations (AMTS) which monitor reflective prismatic targets on bridge structures, inclinometers in soil adjacent to critical subsurface structures, and piezometers to monitor groundwater levels adjacent to underground excavations.