Performance Monitoring System
Design and install of sensors, data loggers, and data management system to monitor performance
The Interstate 10 Twin Span Bridge over Lake Pontchartrain, was constructed to replace the previous bridge, which had been heavily damaged by Hurricane Katrina. This project was the largest public works project in the history of Louisiana. The new bridge was built 300 feet to the east with an elevation of 30 feet (21 feet higher than the old bridge) and an 80-foot high-rise section for marine traffic. The main span consists of steel girders resting on concrete bents with pre-cast concrete pile foundations.
Geocomp worked with Louisiana’s Transportation Research Center to design and install sensors, data loggers, and data management systems to collect in-service performance data to help answer critical design questions. The sensors installed included: strain gages mounted on steel girders and cast inside concrete girders; strain gages cast inside the foundation piles; water pressure cells to measure wave forces; inclinometers and accelerometers to measure lateral movements of piles; corrosion meters; and Weigh-in-Motion (WIM) system.