The Challenge

  • Largest construction project in Virginia’s history
  • Provide quick turnaround on hundreds of samples

The Hampton Roads Bridge-Tunnel Expansion is the largest construction project in Virginia’s history. The project’s total budget is $3.8 billion, making it also one of the largest infrastructure projects in the country. The current I-64 Hampton Roads Bridge-Tunnel (HRBT) is located on the southeastern coast of Virginia. It is a 3.5 mile facility with two 2-lane immersed- tube tunnels connecting artificial islands, with trestle bridges to shore. This corridor is one of the most congested in the region. To ease congestion problems in this area and enhance travel time reliability, new twin two-lane tunnels will be built west of the existing eastbound tunnel to carry all eastbound traffic.

The project will also include approximately 14,000 feet of new marine bridges and the reconstruction or replacement of more than a dozen bridge structures. The new expansion will support emergency evacuation, improve safety, increase capacity and update transportation management systems.

The Solution

Coordination between GTX, HDR, and Mott MacDonald was necessary to setup the most effective prioritized testing program between the two sites and sample sets. Results were issued on a weekly basis based off priority scheduling with the client’s immediate needs. Testing included large quantities of index and automated testing:

  • Consolidation testing following VDOT testing parameters
  • UU Triaxial
  • CU Triaxial
  • CD Triaxial
  • Direct Shear
  • Direct Simple Shear
  • Swell Testing
  • Constant Rate of Strain (CRS)

Services Provided

Laboratory Testing

Hundreds of soil samples tested using various consolidation and shear tests

Laboratory Reporting

Testing results were issued to the client on a weekly basis through automated testing

Related Projects

Baltimore Red Line Tunnels

Baltimore Red Line Tunnels

Value Delivered:

Ability to handle a variety of testing within one laboratory
Coordinated work with specialty subcontractors for the
client
Provided specialized test reports as specified by the client
Tren Urbano

Tren Urbano Rail System

Value Delivered:

Fast turnaround, high quality results supporting timely
decision making
Supported multiple firms while retaining strict chain of
custody and data integrity

Ready to Speak
with our
Experts